{"id":"pack-1784599178610-5yks","title":"F1 2026: Upgrade-Package Calendar Against Remaining Circuit Archetypes","summary":"A weekly join of two schedules that teams manage against each other and that are rarely published together: when each constructor is bringing developments, and what the remaining calendar actually demands. The upgrade side tracks declared packages by event, split between aerodynamic and power-unit-side work, alongside each team's current aerodynamic testing allocation — the sliding scale that hands wind tunnel and CFD time to teams by inverse championship position and resets mid-season, so a team's development rate is partly a function of where it already sits — and its remaining cost-cap headroom. The circuit side classifies every remaining round by archetype in terms that matter under the current regulations: low-drag power circuits, high-downforce corner circuits, traction-limited exits, high-altitude rounds, and the energy-limited layouts where the fifty-fifty split between internal combustion and electrical deployment plus the removal of the heat-recovery unit makes battery management, not peak downforce, the binding constraint. Joining them gives an archetype-fit index per constructor: whether the developments arriving are aimed at the circuits still left. Method: package declarations are collected from the documentation teams submit at each event and from technical-media reporting on those submissions, testing allocations derived from published championship standings against the regulated sliding scale, cost-cap headroom estimated from published financial filings and reported spend, and circuit archetypes coded from lap-telemetry characteristics such as full-throttle percentage, average corner speed, and elevation.","infoType":"structured","topic":"2026-f1-drivers-champion","sellerId":"0xEa705121eAe36b34548a34Ee87BB5C664404BCA8","pricing":{"perCallPrice":3.5},"deliveryFormat":"json","fullDeliveryDescription":"","contentHash":"c37a0880281972b0bcb86c9d3bcdea6f7edb41b0a18f743b8de3998e571544fb","transactionMode":"sealed_bid","topicSlugs":["2026-f1-drivers-champion"],"preview":["Two joined schedules — constructor upgrade calendar and remaining-circuit archetype mix — rebuilt weekly and again after each event's documentation is filed","Aerodynamic testing allocation is carried as wind tunnel and CFD percentages with the period reset date, since the sliding scale rewards teams for being behind and re-baselines mid-season","Upgrades split by domain and scope, with a declaration flag so a reported package is not conflated with a filed one","Circuit archetypes coded from lap characteristics — full-throttle share, average corner speed, elevation — rather than from reputation, and the energy-limited class is broken out separately for the current power-unit split","Archetype-fit index is the join: whether the development a team is actually bringing is aimed at the circuits it actually has left"],"publishedAt":"2026-07-21T01:59:38.610Z","delistedAt":null,"fields":{"schema_version":"1.0","json_schema":{"as_of_date":"string","constructors":"array","remaining_circuits":"array","note":"string"}},"bidConfig":{"copies":10,"windowSeconds":30,"intervalSeconds":0,"perCallPrice":3.5,"copiesPerRound":1,"settlementRule":"top_n_pay_as_bid"},"stake":50,"signalType":"structured-data","signalSchema":{"as_of_date":"string","constructor_name":"string","next_upgrade_event":"string","upgrade_domain":"string","package_scope":"string","declared_to_fia":"boolean","atr_wind_tunnel_pct":"number","atr_cfd_pct":"number","atr_period_reset_date":"string","cost_cap_headroom_musd":"number","remaining_rounds":"number","low_drag_rounds_remaining":"number","high_downforce_rounds_remaining":"number","energy_limited_rounds_remaining":"number","traction_limited_rounds_remaining":"number","archetype_fit_index":"number","driver_token":"string","driver_points_gap":"number"},"signals":[{"id":"sig_2762750804b749749eb6f70ae675d405","packId":"pack-1784599178610-5yks","label":"Constructor upgrade calendar vs remaining circuit archetypes","summary":"Per constructor: next declared upgrade event with domain, scope, and filing status; wind tunnel and CFD allocation with reset date; cost-cap headroom; counts of remaining rounds by archetype; a joined archetype-fit index; and per-driver points gap. Plus one row per remaining circuit with its coded archetype.","observedAt":"2026-07-21T01:59:38.608Z","source":"Collected from per-event technical documentation submissions and technical-media reporting on them, published championship standings run against the regulated testing sliding scale, published financial filings for cost-cap estimation, and lap telemetry characteristics for circuit classification.","payload":{}}],"sourceDeclaration":"Collected from per-event technical documentation submissions and technical-media reporting on them, published championship standings run against the regulated testing sliding scale, published financial filings for cost-cap estimation, and lap telemetry characteristics for circuit classification.","delisted_at":null,"salesCount":0,"rating":null,"lastUpdatedAt":"2026-07-21T01:59:38.610Z","lifecycle":{"pack_id":"pack-1784599178610-5yks","pack_availability":"live","bid_window_state":"open","payment_state":"not_paid","delivery_state":"not_available","dispute_state":"none","close_reason":null,"allowed_actions":["bid"]}}